Residential Electrical · Miami

Panel Upgrades in Miami, FL

Replacing undersized, corroded or obsolete panels, and raising the service to carry what the house now actually draws.

The electrical panel is where a house's history is written, and in South Florida it is usually a short story about a service sized in 1962 for a household that had none of the things now plugged into it. Frazier Electrical Solutions LLC replaces panels and upgrades services across Miami-Dade and Broward County, coordinated with FPL and permitted through the right building department.

A panel change and a service upgrade are not the same job, and knowing which you need is most of the value. A panel can run out of space long before the service runs out of capacity — and occasionally the reverse. The load calculation settles it.

Why choose Frazier Electrical Solutions LLC

  • The load calculation comes before the quote. What the house actually draws, not what the label on the old panel says.
  • Licensed Florida electrical contractor, EC #13012609. Panel and service work is permitted work, and it gets filed, inspected and signed off.
  • FPL coordination is part of the job. A service change needs the utility disconnect and reconnect scheduled. We arrange it so the house is not without power for longer than it has to be.
  • Built for the hurricane zone. Miami-Dade and Broward sit in the High-Velocity Hurricane Zone, which governs how masts and meter enclosures are attached and which equipment carries a Miami-Dade Notice of Acceptance.
  • Landed neatly. Conductors dressed, breakers labelled, and a panel directory that is actually filled in.

Our panel upgrade process

  1. Survey and load calculation. Existing service size, existing loads, planned additions, and what the house is likely to add next.
  2. Establish the scope. Panel only, panel and service, or panel plus meter enclosure and mast — with a price against each.
  3. Permit and utility. Filed with the city or county building department, and the FPL disconnect booked.
  4. Change out. Old gear removed, new panel and equipment set, circuits transferred, grounding and bonding brought up to current requirements.
  5. Inspect and restore. Presented for inspection, utility reconnected, everything tested and the directory completed.

When a panel needs replacing here

It is obsolete. Federal Pacific Stab-Lok and Zinsco panels turn up regularly in 1950s to 1970s South Florida housing, and both have a documented history of breakers failing to trip. Insurers ask about them. They are the most common reason a replacement is not really optional.

It has corroded. This is the local one. Coastal humidity and salt reach into meter enclosures and panels, and corroded bus bars, seized breakers and green terminations are found on equipment far younger than its rated life. On the barrier islands and the canal streets it is routine.

It has run out of space. A kitchen renovation, a pool heater, a car charger, a mini-split for the converted garage — modern additions need dedicated circuits, and a panel full of tandem breakers is already telling you something.

The service is too small. Many houses from the 1950s and 60s are still on 100 amps, or a partial upgrade to 150, while carrying central air, an electric range, a dryer and a pool pump. Adding a charger or a second AC system on top is where it stops working.

Insurance or a sale is forcing the issue. Four-point inspections examine the panel, and an obsolete or corroded one shows up immediately.

Serving Miami, FL and nearby

Miami, Miami Beach, Coral Gables, Doral, Aventura, North Miami, Fort Lauderdale, Hollywood, Hallandale Beach and Pembroke Pines.

Call or text (786) 292-1194 with a photo of the panel and its label, and we can usually tell you what you have and roughly what it will take.

Frequently Asked Questions

How long will my power be off for a panel change?

Most residential changeouts are a single day, with the power off for the working part of it. A service upgrade also needs FPL to disconnect and reconnect, which we schedule in advance so the outage is planned rather than open-ended. If the timing matters — medical equipment, working from home — tell us and we will plan around it.

Do I need a permit for a panel replacement in Miami-Dade or Broward?

Yes. Panel changes and service upgrades are permitted, inspected work in both counties. In Miami-Dade it goes to your city's building department, or the county if you are unincorporated; in Broward it goes to your city's building division under the county Board of Rules and Appeals. We file it and schedule the inspection.

Is 100 amps enough for my house?

It depends entirely on what is in the house. A 100-amp service can be fine for a small home with gas appliances, and badly undersized for one that has gained central air, an electric range, a pool pump and a car charger. A load calculation answers it properly — and it is the same calculation an inspector will expect to see.

Why does my panel look corroded when it is indoors?

Because the moisture usually arrives through the service rather than the room. Humid, salt-laden air tracks in along the conductors from the meter and mast, and coastal properties see corrosion inside panels far earlier than their rated life suggests. It is one of the reasons we look at the meter enclosure and mast as part of any panel quote.

Need panel upgrades? We're ready to help.

Free estimate, written quote, no obligation — and a straight answer about what your Miami home actually needs.

  • Florida Electrical Contractor EC #13012609
  • Serving Miami, Miami Beach, Coral Gables, Doral
Call Now Get Quote